January 22, 2007
Tendering
Non-compliance a sticking point
In 1981, the Supreme Court of Canada’s decision in Ontario v. Ron Engineering changed the legal landscape of invitations to tender.
In that case, a bidder was prevented from revoking a bid on the grounds that the submission featured an omission. In the ensuing 25 years, a significant number of court cases have hinged on minor contractual issues, with compliant but failed bidders suing owners for lost profits because the winning bidder could be shown to be non-compliant. “Most construction litigation is extremely expensive, but it doesn’t cost much to be heard in these cases,” says Christopher Hirst, a partner with Vancouver’s Alexander, Holburn, Beaudin & Lang.
“The litigation usually involves only a few small points, and the trial might last a week, so the damages you might be entitled to could be very significant compared to the cost of the trial.” But there are exceptions.
The case of Double N Earthmovers Ltd. v. City of Edmonton was heard by the Supreme Court of Canada last summer. Double N initially sued the City of Edmonton in 1986 because the city accepted a non-compliant bid from rival firm, Sureway Construction.
Although Sureway’s bid was lowest, the contract specified that all equipment used in fulfilling the contract must be from 1980 or newer. The company’s equipment was later shown to be a 1979 model. “Sometimes things move very slowly,” says Samuel Kravinchuk, a lawyer representing Double N. “It’s an embarrassment for my client.”
In other cases, a tiny omission provides a legal focal point. In Johnson’s Construction Ltd. v. Newfoundland (2000), The Newfoundland Supreme Court ruled that an owner had no right to accept a bid that was missing one unit price, because the owner had made this a condition of acceptance.
Owners are attempting to sidestep such legal perils by carefully wording their tender documents, says Robert Worthington, president of Surrey, B.C. law firm Worthington and Associates, and author of the Purchasing Law Handbook.
“Compliant in Canada means 100 per cent compliant to the words in the invitation to bid, both for the bidder and for the owner in the evaluation process. Some owners try to expressly claim the right to waive non-compliance, but isn’t that contrary to the rules?”
Worthington notes some large companies no longer accept competitive bids because the legal risk of a lawsuit arguing non-compliance is too great.
| MOST POPULAR STORIES |
- Trucking industry hit hard by British Columbia’s new carbon tax
- ATCO wins contract to build massive worker village in United Arab Emirates
- Aecon Group wins contract to twin Highway 21 near Edmonton
- Royal Architectural Institute of Canada launches wiki on carbon-neutral building
- Bank of Canada’s interest-rate “hawks” begin to ascend
- 20 Most Popular Stories
| CURRENT STORIES |
- Crane lands at Ledcor’s Shangri-La site
- Enhance Energy plans to build commercial carbon-dioxide pipeline
- Detailed designs underway for Circle Drive bridge over South Saskatchewan River
- Federal government launches Wage Earner Protection Program
- Bosa Construction builds high-rise Claremont condo in Westwood Village
- Supreme Court sides with owners in three construction contract disputes
- Liberal “Green Shift” plan fails to address transit woes, industry officials say
- Mobile-crane accident puts pedestrian in hospital
- Master Builders Queensland calls for Australian safety blitz after scaffolding deaths
| ALEX’S BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in Canada's economic environment. He also shares light-hearted reflections on life and current events.
Economics Blog More 
- Some Other Keys to Commodity Pricing (2) (July 18, 2008)
- Some Other Keys to Commodity Pricing (1) (July 17, 2008)
- There are Exciting Answers to the World’s Food Shortage (July 16, 2008)
Lifestyle Blog More 
- Taking Somebody Else’s Child to the Cottage (July 14, 2008)
- Which Letter of the Alphabet is the Funniest? (July 7, 2008)
| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- George Brown College wins $61.5 million in provincial funds for Toronto Waterfront campus (Jul 14, 2008)
- Plans get underway for Saline Creek Plateau and Parsons Creek communities (Jul 14, 2008)
- Life Construction seeks trade prices for 500 on Sherbourne condominium project (Jul 14, 2008)
- Working designs nearly complete for Joseph and Wolf Lebovic Jewish Community Campus (Jul 11, 2008)
- Alberta commits $200 million to Federal Building renovation and redevelopment (Jul 10, 2008)