January 22, 2007
Tendering
Non-compliance a sticking point
In 1981, the Supreme Court of Canada’s decision in Ontario v. Ron Engineering changed the legal landscape of invitations to tender.
In that case, a bidder was prevented from revoking a bid on the grounds that the submission featured an omission. In the ensuing 25 years, a significant number of court cases have hinged on minor contractual issues, with compliant but failed bidders suing owners for lost profits because the winning bidder could be shown to be non-compliant. “Most construction litigation is extremely expensive, but it doesn’t cost much to be heard in these cases,” says Christopher Hirst, a partner with Vancouver’s Alexander, Holburn, Beaudin & Lang.
“The litigation usually involves only a few small points, and the trial might last a week, so the damages you might be entitled to could be very significant compared to the cost of the trial.” But there are exceptions.
The case of Double N Earthmovers Ltd. v. City of Edmonton was heard by the Supreme Court of Canada last summer. Double N initially sued the City of Edmonton in 1986 because the city accepted a non-compliant bid from rival firm, Sureway Construction.
Although Sureway’s bid was lowest, the contract specified that all equipment used in fulfilling the contract must be from 1980 or newer. The company’s equipment was later shown to be a 1979 model. “Sometimes things move very slowly,” says Samuel Kravinchuk, a lawyer representing Double N. “It’s an embarrassment for my client.”
In other cases, a tiny omission provides a legal focal point. In Johnson’s Construction Ltd. v. Newfoundland (2000), The Newfoundland Supreme Court ruled that an owner had no right to accept a bid that was missing one unit price, because the owner had made this a condition of acceptance.
Owners are attempting to sidestep such legal perils by carefully wording their tender documents, says Robert Worthington, president of Surrey, B.C. law firm Worthington and Associates, and author of the Purchasing Law Handbook.
“Compliant in Canada means 100 per cent compliant to the words in the invitation to bid, both for the bidder and for the owner in the evaluation process. Some owners try to expressly claim the right to waive non-compliance, but isn’t that contrary to the rules?”
Worthington notes some large companies no longer accept competitive bids because the legal risk of a lawsuit arguing non-compliance is too great.
| MOST POPULAR STORIES |
- Government takes over Northwest Territories P3 bridge project
- Venues decommissioned in Olympic afterglow
- Construction restarting on hospital in Fort St. John, British Columbia
- Dominion Construction gets two B.C. contracts
- Hogg’s Hollow tragedy changed Ontario’s construction industry
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 371 projects with a total value of $1,380,346,147 that Reed Construction Data Building Reports reported on yesterday.
$55,000,000 Winnipeg MB CANCELLED/ DEFERRED
CONDOMINIUM APARTMENT, COMMERCIAL & HOTEL ALTS
$50,000,000 Vancouver BC Prebid
$30,000,000 Wainwright AB Prebid
| CURRENT STORIES |
- Venues decommissioned in Olympic afterglow
- Canadian Construction Association chair bids farewell
- Wood being considered as preferred building material for federal projects
- Grizzly Oil Sands seeks approval for project near Fort McMurray
- Search continues for sustainable architecture
- Seven British Columbia communities sign Wood First agreements
- U.S. construction employment declines in January
- Ottawa unveils plan to cut red tape
- Canadian Construction Association awards highlight excellence
- Pride, sadness as Hogg's Hollow memorial unveiled
- Commemorative quilt gets permanent home
- ‘Sandhogs’ who perished had diverse personal stories
- Coverage of Hogg’s Hollow tragedy anniversary should be required reading
- Pursuit of LEED could result in professional negligence, insurance executive warns
- New Brunswick to cover debts of troubled Atcon Group
- Ex-Quebec minister says Liberals got ‘generous’ donations from construction sector
- Regulatory delays hinder start of Mackenzie Gas Project
- Las Vegas CityCenter general contractor Perini Building suing MGM Mirage
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Sub-sector investment spending intentions from Statistics Canada’s latest survey (March 17, 2010)
- A dozen incredible measurement sets on Canada’s changing ethnic mix (March 9, 2010)
- How fragile is recovery around the world? (March 3, 2010)
- More

| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- Rounthwaite Dick & Hadley Architects begin work on arena plans for Flamborough, Ontario (Aug 17, 2009)
- Orillia Market Square aims for LEED Silver certification (Jun 25, 2009)
- Designs for new York Region District School Board building features energy efficiency (Jun 23, 2009)
- IPC Energy considers Milford location for future wind farm (May 22, 2009)
- Waterloo partnership seeks LEED Silver for West Side Family YMCA and District Library (May 22, 2009)