November 22, 2007
Adanac Molybdenum Corporation
Head Office:
Ste 200, 2055 - 152nd St
Surrey BC V4A 4N7
Tel: 604-531-9639
Fax: 604-531-9634
Email: info@adanacmoly.com
Website: www.adanacmoly.com
Key Personnel: Larry W. Reaugh, Executive Chairman; Michael MacLeod, President & CEO; Ed Lee, Executive Vice President
Nature of Ownership: Public
Volume: $270,000,000
Areas of Expertise: Mining
Corporate Profile: New pressures in molybdenum supply and demand have risen to the forefront this millennium where usage of the metal is entering a new era. Asia is finally experiencing an industrial revolution that will strain existing resources for the next several decades. Currently the abundance of existing molybdenum deposits will easily fill increased demand, but are years away from obtaining production. Adanac’s belief is that the 20,000 tonne per day open pit Ruby Creek mine will be the first major primary molybdenum mine to be brought into production and will enjoy the highest prices resulting in rapid payback of investment. Recognizing the moly trend in late 2003 the company implemented its plan to produce their Ruby Creek Molybdenum Deposit by early 2008. Currently the company has an 18 month lead over similar projects.
Major Projects: Ruby Creek, BC; B&C Springs, Nevada; Pine Nut, Nevada; Cucomungo, Nevada.
—updated November, 2007
| MOST POPULAR STORIES |
- Not all ‘green’ buildings are healthy buildings, Sterling says
- Global economic crisis hits Calgary’s Bow office tower
- Alberta leads the charge toward solar energy innovation
- Public-private partnerships not immune to economic downturn, expert panel says
- MetroTower III aims to reach new heights for green building
- 20 Most Popular Stories
| CURRENT STORIES |
- MetroTower III aims to reach new heights for green building
- BC Auditor General’s report finds fault with Industrial Training Authority
- EDC announces $100 million in funding for Canadian projects in United Arab Emirates
- Korky Koroluk: When designing green roofs, think ‘stormwater retention’
- PPP Canada plans to make municipal infrastructure projects its first priority
- Beedie Group partners with Terasen on $25-million alternative energy system at Fraser Mills
- Manitoba joins forces with Babcock & Brown to build Canada’s largest wind farm
- Use of local resources should not be mandated in P3 contracts, panelists say
- Di-Tech’s specialized equipment puts company on the cutting edge
- New insurance legislation threatens Ontario contractors, CFIB warns
- Two British Columbia projects win Canadian Council for Public-Private Partnerships awards
| ALEX’S BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in Canada's economic environment. He also shares light-hearted reflections on life and current events.
Economics Blog More 
- Canada’s Recession, the Economic Statement and Coalition Government (December 1, 2008)
- The United States will be a Leader in Deflationary Price Drops (November 28, 2008)
- New and Existing Home Prices Moderate as Economy Contracts (November 25, 2008)
Lifestyle Blog More 
- The Curious Meanings of some Canadian place names Continued (December 1, 2008)
- A Mathematical Proof that Economists are Sexy (November 21, 2008)
| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- Rio Tinto Alcan invests in new run-of-river hydro project at Shipshaw power station (Nov 27, 2008)
- Graziani + Corazza Architects Inc. near completion of working drawings for Aura at College Park (Nov 26, 2008)
- Roseau River First Nation seeks private investors for community medical office (Nov 26, 2008)
- Ventin Group readies working drawings for Goodes Hall at Queen’s University (Nov 26, 2008)
- Major redevelopment planned for Lloydminster Hospital (Nov 26, 2008)