LATEST NEWS
Green Building
April 23, 2008
Green Building
New LEED Canada model tracks building performance
The Canada Green Building Council is collaborating with leading commercial property owners in development of a new building performance tracking and management model.
Through their participation in the LEED Canada pilot project, owners and managers of commercial buildings are testing the design of new energy measurement, efficiency data analysis tools and web-based delivery.
Building performance baselines will be integrated into the next generation of the green building rating system, to be launched in spring 2009. Provisions will be made for certification at distinct stages of a building’s life cycle to foster continuous improvements in energy and environmental efficiency and an ongoing reduction in greenhouse gas emissions.
Thomas Mueller, council president and CEO said the CaGBC is conducting the pilot program to ensure that the next generation of LEED fully meets the needs of Canada’s commercial building owners and managers.
“The input and collaboration from pilot participants is instrumental to the design of a system that will support their efforts in the continuous improvement of their building performance,” he said.
The pilot project involves 44 buildings across the country. Canadian Construction Association (CCA) spokesman Jeff Morrison said that while contractors have more of a stake in design and construction of buildings than operations, the council initiative is nevertheless an exciting one.
“I think the big drawback of LEED right now is that it is a one-time measure of a building’s performance at the time of construction,” said the CCA’s director of government relations and public affairs and environment committee secretary.
| MOST POPULAR STORIES |
- Mobile-crane accident puts pedestrian in hospital
- Bank of Canada’s interest-rate “hawks” begin to ascend
- Liberal “Green Shift” plan fails to address transit woes, industry officials say
- Crane lands at Ledcor’s Shangri-La site
- Enhance Energy plans to build commercial carbon-dioxide pipeline
- 20 Most Popular Stories
| CURRENT STORIES |
- WorkSafeBC blames Canada Line crane death on lack of operator training
- Plan to certify B.C. crane operators continues
- Chinese construction market offers opportunities and risks to Canadian contractors
- Construction boom helps portable restroom businesses “clean up”
- TransCanada Corp. begins construction plans for $320-million Kibby wind-power project
- Saskatchewan’s skilled trades workers head home
| ALEX’S BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in Canada's economic environment. He also shares light-hearted reflections on life and current events.
Economics Blog More 
- More on China and Japan – Similarities and Differences (July 24, 2008)
- A Higher Proportion of Homeownership, Mortgages and Condos (July 23, 2008)
- Intentions to Renovate and Buy a Home Both Decline in 2008 (July 22, 2008)
Lifestyle Blog More 
- Doing the Economics Tango (July 21, 2008)
- Taking Somebody Else’s Child to the Cottage (July 14, 2008)
| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- BMW Canada celebrates groundbreaking at site of new corporate headquarters (Jul 23, 2008)
- Thompson Rivers University receives funding for library, First Nations learning centre (Jul 21, 2008)
- Vrancor negotiates with City of Oshawa for downtown brownfield site (Jul 21, 2008)
- Hilton Hotels plans Waldorf-Astoria hotel on Sherbrooke Street (Jul 21, 2008)
- Manitoba Hydro plans new Riel Converter Station (Jul 21, 2008)
