LATEST NEWS
Green Building | Engineering | Concrete | Trade Contracting | Steel | Water & Wastewater | Roadbuilding
May 26, 2008
ZAS ARCHITECTS INC.
The $1.2-billion project pictured above is currently in the design development phase.
Dubai Construction
Toronto firm designs waterfront development in Dubai
Toronto’s ZAS Architects and its affiliate office in Dubai are designing a $1.2 billion (Cdn) project on a prominent site on the Dubai waterfront.
The project, to be built by a local developer, boasts 7.2 million square feet of residential and retail space.
A total of five residential towers will be built, ranging in height from 45 to 60 storeys.
The development is being designed to achieve a minimum rating of LEED Silver from the U.S. Green Building Council.
“Our design will create a waterfront destination that is dynamic, sustainable and distinctive,” said Marek Zawadzki, senior design partner at ZAS, whose firm won the assignment after placing first in an international design competition.
To be constructed on a partially man-made peninsula with beach on one side and a marina on the other, the project includes a four-level podium housing retail and commercial space and parking for 6,000 cars, capped with a landscaped roof park.
This elevated terrain is punctuated with bridges, canopies and ribbons of parkland.
The towers themselves will be located above the podium.
Column-free floor plates are a key feature. A structural steel exoskeleton is an integral part of the design.
A concrete central core and concrete outrigger beams provide the necessary lateral stability.
“Commercial buildings have commonly used column-free designs,” Zawadzki said, noting that ZAS may be one of the first firms to transfer this technology to a large-scale residential application.
Being undertaken jointly by ZAS Architects in Toronto and ZAS International in Dubai, the project is currently in the design development phase. The developer is Nakheel, which has been responsible for other coastal projects in Dubai.
The team also includes Canadian structural engineering consultants NCK Engineering/Trow Associates and mechanical-electrical engineering consultants Jain & Associates Ltd.
The landscape architect is Boston’s Stoss Landscape & Urbanism.
Zawadzki said ZAS is looking at several options for achieving LEED certification, at either the Silver or Gold level. The UAE is in the process of setting up its own green building council.
“At the moment, we’re not 100 per cent sure which level we will be able to achieve,” he said.
Energy-efficient design is one part of the equation, Zawadzki said. Renewable energy sources could be incorporated. Efficient use of water is also a priority, given the desert environment.
ZAS also designed the 53-storey Duja Tower in Dubai. Construction is to start next month on the $200 million project.
| MOST POPULAR STORIES |
- Government takes over Northwest Territories P3 bridge project
- Dominion Construction gets two B.C. contracts
- Venues decommissioned in Olympic afterglow
- International Living Building Institute launches new challenge
- Construction restarting on hospital in Fort St. John, British Columbia
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 313 projects with a total value of $3,164,198,755 that Reed Construction Data Building Reports reported on yesterday.
$250,000,000 Division No 4 MB Prebid
$149,200,000 Fort Nelson BC Tenders
HYDROELECTRIC GENERATING STATIONS
$68,000,000 Sunshine Coast RD BC Negotiated
| CURRENT STORIES |
- Venues decommissioned in Olympic afterglow
- Canadian Construction Association chair bids farewell
- Wood being considered as preferred building material for federal projects
- Grizzly Oil Sands seeks approval for project near Fort McMurray
- Search continues for sustainable architecture
- Seven British Columbia communities sign Wood First agreements
- U.S. construction employment declines in January
- Ottawa unveils plan to cut red tape
- Pride, sadness as Hogg's Hollow memorial unveiled
- Commemorative quilt gets permanent home
- Despite safety improvements, underground dangers still exist
- ‘Sandhogs’ who perished had diverse personal stories
- Commemorative quilt also a story of victims’ families
- Filling labour gap a top priority for incoming Canadian Construction Association chair
- Niagara Construction Association president worked her way up
- Pursuit of LEED could result in professional negligence, insurance executive warns
- Nova Scotia officials ‘comfortable’ covering cost of $60-million wind plant
- New Brunswick plans to install wildlife fencing for highway construction season
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Sub-sector investment spending intentions from Statistics Canada’s latest survey (March 17, 2010)
- A dozen incredible measurement sets on Canada’s changing ethnic mix (March 9, 2010)
- How fragile is recovery around the world? (March 3, 2010)
- More

| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- Rounthwaite Dick & Hadley Architects begin work on arena plans for Flamborough, Ontario (Aug 17, 2009)
- Orillia Market Square aims for LEED Silver certification (Jun 25, 2009)
- Designs for new York Region District School Board building features energy efficiency (Jun 23, 2009)
- IPC Energy considers Milford location for future wind farm (May 22, 2009)
- Waterloo partnership seeks LEED Silver for West Side Family YMCA and District Library (May 22, 2009)



