October 13, 2008
Kaolin clay, a substance which enhances the strength and durability of concrete products, is the focus of a new manufacturing plant near Wood Mountain, Saskatchewan.
Whitemud Resources opens plant to produce metakaolin concrete additive
WOOD MOUNTAIN, SASK.
It’s not exactly a household name, but metakaolin (pronounced “meta-kay-lin”) could be the next big thing in concrete ingredients.
Derived from kaolin clay, the substance can be used to replace Portland cement to create a material that enhances the strength and durability of concrete products, while making it more resistant to chemical attack.
Because the material is light in colour, it also reflects sunlight, reducing heat island effect.
Alberta’s Whitemud Resources has opened a manufacturing plant near Wood Mountain, Saskatchewan, about 245 kilometres southwest of Regina.
At the plant, kaolin ore from the nearby Gollier Creek quarry is placed in a kiln to remove microscopic water molecules.
The result is the metakaolin that can be used as an additive to replace about 20 per cent of the cement in concrete.
“We’re having the material evaluated by a number of ready-mix and pre-cast concrete companies in North America, as well as several states and provinces,” said Murray Yewchuk, vice president of marketing for the company.
Oregon has already approved the use of the product for state highways under its trade name, Whitemud MK, and the Saskatchewan Ministry of Highways and Infrastructure has announced a pilot project for a provincial highway incorporating the material.
Metakaolin has been traditionally by-passed as a concrete additive because it’s considered too expensive.
Used as a white coating for paper products, the material demands a high price.
The company said it’s discovered a way of processing the material to road construction standards that cuts the price.
“We make it more affordable by using a different processing strategy,” said Yewchuk.
“We don’t make it pure white the way it’s used in other industries. At this level of processing it’s available at a slight premium to Portland cement, but provides myriad benefits as a concrete additive.”
The amount of metakaolin available was also an impediment to using it in road surfacing.
The Gollier Creek quarry, however, contains an estimated 160 million tonnes of ore, enough to produce an initial output of about 150,000 tonnes of metakaolin per year.
About 60 per cent of the ore is fine silica sand, a product for which the company also hopes to find a market.
| MOST POPULAR STORIES |
- Government takes over Northwest Territories P3 bridge project
- Dominion Construction gets two B.C. contracts
- Venues decommissioned in Olympic afterglow
- International Living Building Institute launches new challenge
- Construction restarting on hospital in Fort St. John, British Columbia
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 313 projects with a total value of $3,164,198,755 that Reed Construction Data Building Reports reported on yesterday.
$250,000,000 Division No 4 MB Prebid
$149,200,000 Fort Nelson BC Tenders
HYDROELECTRIC GENERATING STATIONS
$68,000,000 Sunshine Coast RD BC Negotiated
| CURRENT STORIES |
- Venues decommissioned in Olympic afterglow
- Canadian Construction Association chair bids farewell
- Wood being considered as preferred building material for federal projects
- Grizzly Oil Sands seeks approval for project near Fort McMurray
- Search continues for sustainable architecture
- Seven British Columbia communities sign Wood First agreements
- U.S. construction employment declines in January
- Ottawa unveils plan to cut red tape
- Pride, sadness as Hogg's Hollow memorial unveiled
- Commemorative quilt gets permanent home
- Despite safety improvements, underground dangers still exist
- ‘Sandhogs’ who perished had diverse personal stories
- Commemorative quilt also a story of victims’ families
- Filling labour gap a top priority for incoming Canadian Construction Association chair
- Niagara Construction Association president worked her way up
- Pursuit of LEED could result in professional negligence, insurance executive warns
- Nova Scotia officials ‘comfortable’ covering cost of $60-million wind plant
- New Brunswick plans to install wildlife fencing for highway construction season
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Sub-sector investment spending intentions from Statistics Canada’s latest survey (March 17, 2010)
- A dozen incredible measurement sets on Canada’s changing ethnic mix (March 9, 2010)
- How fragile is recovery around the world? (March 3, 2010)
- More

| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- Rounthwaite Dick & Hadley Architects begin work on arena plans for Flamborough, Ontario (Aug 17, 2009)
- Orillia Market Square aims for LEED Silver certification (Jun 25, 2009)
- Designs for new York Region District School Board building features energy efficiency (Jun 23, 2009)
- IPC Energy considers Milford location for future wind farm (May 22, 2009)
- Waterloo partnership seeks LEED Silver for West Side Family YMCA and District Library (May 22, 2009)



