October 9, 2008
Kaolin clay, a substance which enhances the strength and durability of concrete products, is the focus of a new manufacturing plant near Wood Mountain, Saskatchewan.
Whitemud Resources opens plant to produce metakaolin concrete additive
WOOD MOUNTAIN, SASK.
It’s not exactly a household name, but metakaolin (pronounced “meta-kay-lin”) could be the next big thing in concrete ingredients.
Derived from kaolin clay, the substance can be used to replace Portland cement to create a material that enhances the strength and durability of concrete products, while making it more resistant to chemical attack.
Because the material is light in colour, it also reflects sunlight, reducing heat island effect.
Alberta’s Whitemud Resources has opened a manufacturing plant near Wood Mountain, Saskatchewan, about 245 kilometres southwest of Regina.
At the plant, kaolin ore from the nearby Gollier Creek quarry is placed in a kiln to remove microscopic water molecules.
The result is the metakaolin that can be used as an additive to replace about 20 per cent of the cement in concrete.
“We’re having the material evaluated by a number of ready-mix and pre-cast concrete companies in North America, as well as several states and provinces,” said Murray Yewchuk, vice president of marketing for the company.
Oregon has already approved the use of the product for state highways under its trade name, Whitemud MK, and the Saskatchewan Ministry of Highways and Infrastructure has announced a pilot project for a provincial highway incorporating the material.
Metakaolin has been traditionally by-passed as a concrete additive because it’s considered too expensive.
Used as a white coating for paper products, the material demands a high price.
The company said it’s discovered a way of processing the material to road construction standards that cuts the price.
“We make it more affordable by using a different processing strategy,” said Yewchuk.
“We don’t make it pure white the way it’s used in other industries. At this level of processing it’s available at a slight premium to Portland cement, but provides myriad benefits as a concrete additive.”
The amount of metakaolin available was also an impediment to using it in road surfacing.
The Gollier Creek quarry, however, contains an estimated 160 million tonnes of ore, enough to produce an initial output of about 150,000 tonnes of metakaolin per year.
About 60 per cent of the ore is fine silica sand, a product for which the company also hopes to find a market.
| MOST POPULAR STORIES |
- High-tech oil sands project near Fort McMurray, Alberta could change industry
- TransCanada begins construction on British Columbia-Alberta pipeline
- VIDEO: B.C. Construction Association welcomes standardized contract forms
- Port Mann Bridge under construction
- Crane accident kills worker at construction site in Burnaby, British Columbia
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 263 projects with a total value of $8,919,878,049 that Reed Construction Data Building Reports reported on yesterday.
NATURAL GAS PROCESSING FACILITY
$500,000,000 Fort Nelson BC Prebid
$250,000,000 Fort Nelson BC Negotiated
$35,000,000 Winnipeg MB Prebid
| CURRENT STORIES |
- Crane operator certification deadline looms in British Columbia
- High-tech oil sands project near Fort McMurray, Alberta could change industry
- Saskatoon bridge closed indefinitely over structural concerns
- City of Regina project turns up all sorts of surprises
- Awareness about qualifications-based selection lacking: Survey
- Canadian Institute of Steel Construction launches Steel Day
- Saskatchewan bridge collapses, causing crane to topple
- Crane tips over, killing worker and injuring two
- Saskatoon man pulled from hole at construction site
- Churchill airport gets government cash for infrastructure upgrades
- Stantec acquires health care architectural firm
- Photovoltaic training program aimed at improving safety
- Construction continues on Woodgreen Community Housing development in Toronto
- TransCanada begins construction on Alberta-British Columbia pipeline
- Saskatoon bridge closed indefinitely over structural concerns
- China manufacturing, sales figures rebound
- U.S. workers rate safety standards as top priority
- Labour agreement removed from bidding process for armed forces reserve centre
- Cambodia announces plan for tallest skyscraper in Asia
- Russia opens section of China oil pipeline
- Anemic U.S. housing concerns lumber producers
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Canada’s construction starts in a transition phase (August 27, 2010)
- U.S. initial jobless claims rise to half a million again (August 19, 2010)
- It’s been 35 years since institutional construction starts as strong (August 6, 2010)
- More

















