LATEST NEWS
Green Building | Heavy Equipment | Water & Wastewater | Trade Contracting | Steel | Building Envelope | Concrete
November 18, 2009
FLYNN CANADA
The green roof of Vancouver’s Convention Centre features slopes of up to 53 per cent.
Creating Vancouver Convention Centre’s green roof no simple task
Working atop a structure built on piles and at sometimes extreme angles made life interesting for the crews working on the Vancouver Convention Centre’s green roof.
The biggest living roof in Canada is surrounded by water on three sides, and the marine deck on which the building sits is supported by stilt-like piles.
It also features slopes of up to 53 per cent.
“There are no flat areas,” said Pete Taylor, a senior project manager with Flynn Canada, who oversaw the roof’s construction.
The idea was to integrate the project visually with the surrounding waterfront parkland and mountain backdrop, so that the entire vista appears as a single, crescent-shaped green-belt.
A host of cutting-edge environmental features, including on-site water treatment, deep seawater cooling and heating, and a giant skirt designed to help restore the local fish habitat have the convention centre seeing LEED Gold certification.
But it is the roof that is most visible and that has attracted the lion’s share of attention.
At 6.5 acres, it eclipses the National War Museum’s 2.6-acre green roof to rank as Canada’s biggest. It could hold 15 professional-size hockey rinks.
With more than 400,000 plants and grasses, featuring close to two dozen species native to the Pacific Northwest, the Vancouver roof is very much its own ecosystem.
It uses computers to detect leaks, and through a series of small channels and pipes, funnels excess rainwater for re-use in the washrooms.
The roof even has its own colony of European honeybees.
Work crews encountered no shortage of challenges in building all of this.
However, water was common to all of them.
First, there was the not-so-small matter of getting materials to the site. Access for heavy vehicles was limited to a single entrance on the one side where there was dry land.
“We were sometimes bringing in three to four dump trucks of growing media a day,” Taylor said.
“This was literally in the heart of the downtown, often in rush-hour traffic, and we had no room to park on-site.”
However, access paled in comparison to the structural issues.
Because much of the addition and roof jut out over the water’s edge like a large pier, crews had to find innovative ways to haul materials, including plants, liners, and more than 5,000 cubic metres of growing media, to the top.
And, with the building supported by piles, anything left on the roof had to be carefully and evenly distributed.
Crews had to use a hammerhead crane to reach the rooftop because the roadway at one end was the lone point of access.
“With a regular stick crane you can get the height, but you can’t get the reach,” Taylor said. “With a hammerhead, you can swing in about 120 feet over the roof.”
Working cranes from the water wasn’t an option.
“You’d have to put the crane on a barge, and the cost of doing that is astronomical,” he said.
As soon as crews got materials onto the roof, they had to immediately move them to specific locations using conveyors and lightweight buggies instead of heavy machinery, such as backhoes and bobcats.
The slopes proved particularly challenging.
Taylor said crews built diverters to protect soil and vegetation from Vancouver’s rainy climate.
Workers also laboured underneath rolling castor-style tents to keep materials dry.
Because of the slopes, some areas needed web-style retention systems, built using high-strength polymer matting and stainless steel cables, to hold the growing media, plants and 43 kilometres of drip irrigation piping in place.
Bruce Hemstock, of PWL Partnership, a Vancouver landscape architecture and consulting firm that worked on the project, said the roof portion of the job was one of the most technically challenging assignments his firm has taken on in its 35 years in the business.
“It was a very complicated project, yet we wanted to use simple and straightforward, off-the-shelf components,” he said.
“It was challenging to figure out how to make it all work.”
PWL needed to ensure the construction team could easily obtain materials such as roof drains rather than having them custom built.
“The whole drainage system on the roof was designed so it could be ordered from any manufacturer in Canada and installed on the roof without anything special happening to it,” Hemstock said.
With the various challenges addressed, project participants can focus on its benefits.
These include the stormwater management, and the lush, green exterior is able to curb the heat-island effect, which is typical with concrete and brick and is often blamed for localized warming.
As well, insulation from plants, waterproofing liner, six inches of growing medium, and four inches of extruded polystyrene increase natural temperature control and reduce the need for mechanical heating and cooling.
| MOST POPULAR STORIES |
- International Living Building Institute launches new challenge
- Infrastructure gets funding increase in B.C. Budget 2010
- Terrane Metals Corp. set to start construction on mine near Fort St. James, British Columbia
- Society aiming for net zero energy for all new builds by 2030
- Dominion Construction gets two B.C. contracts
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 342 projects with a total value of $2,911,425,288 that Reed Construction Data Building Reports reported on yesterday.
HOTEL RESORT, GOLF COURSE & WELLNESS CENTRE
$477,000,000 Kelowna BC Prebid
$229,795,000 Edmonton AB Negotiated
$50,000,000 Winnipeg MB Prebid
| CURRENT STORIES |
- Government takes over Northwest Territories P3 bridge project
- Canadian construction experts visit earthquake-ravaged Haiti
- Winnipeg gets new water treatment plant
- Weighing in on the Tercon Contractors appeal decision
- Construction restarting on hospital in Fort St. John, British Columbia
- In new movie, Hamilton construction worker becomes ‘Defendor’ at night
- ‘Quality product cannot come from cutting corners on safety’
- Shop owner suing VANOC over pre-Olympics road construction disruptions
- Fraud charges laid against former head of Quebec labour union
- Pursuit of LEED could result in professional negligence, insurance executive warns
- Province holding information sessions on new Ontario accessibility standard
- Work continues on Market Wharf condo in Toronto
- Chilliwack Cultural Centre project sets tilt-up concrete record
- WSIB report a clear response to ideas we submitted, Ontario General Contractors Association chief says
- SNC-Lavalin subsidiary Profac under scrutiny over federal contract billing
- As prices surge, China may raise interest rates
- Canadian soldiers repair blown-up bridge in Afghanistan
- Canadian Mechanical Contracting Education Foundation offering Gold Seal course for supervisors
- Slovak construction minister sacked amid corruption scandal
- Historic Kingston Dry Dock restored, enhanced
- Centre for Energy Innovation in Windsor, Ontario built using Termobuild HVAC system
- Canadian Standards Association parking garage standard gets tougher
- Accelerated schedules a challenge for vinyl flooring
- Good materials, shoddy workmanship produces poorly performing floor
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- A dozen incredible measurement sets on Canada’s changing ethnic mix (March 9, 2010)
- How fragile is recovery around the world? (March 3, 2010)
- The world financial crisis goes into extra innings (February 25, 2010)
- More

| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- Rounthwaite Dick & Hadley Architects begin work on arena plans for Flamborough, Ontario (Aug 17, 2009)
- Orillia Market Square aims for LEED Silver certification (Jun 25, 2009)
- Designs for new York Region District School Board building features energy efficiency (Jun 23, 2009)
- IPC Energy considers Milford location for future wind farm (May 22, 2009)
- Waterloo partnership seeks LEED Silver for West Side Family YMCA and District Library (May 22, 2009)



