LATEST NEWS
February 20, 2012
Negotiations on glacier walk moving forward
staff writer
Parks Canada and Brewster Travel Canada are moving forward with negotiations about a proposal for the construction of a glass and steel bridge in Jasper National Park, which will allow tourists and visitors to walk suspended above the Sunwapta Valley and the Columbia Ice Fields.
“We are extremely happy with the outcome of this decision,” said Michael Hannan, President of Brewster Travel Canada.
“Over the course of these past two years, we have worked with Parks Canada to ensure all environmental guidelines and regulatory processes not only meet but exceed the standards set for projects operating within a national park.”
Parks Canada recently announced that the Glacier Discovery Walk project has met environment assessment guidelines and is acceptable within Parks Canada’s policy framework, which governs the management and protection of our national parks.
The proposed project will consist of a 400-metre interpretive boardwalk and a glass-floored observation platform extending 30 metres out over the Sunwapta Valley. The tourist attraction would be owned by Brewster Travel Canada and replace a roadside turnout on Highway 93.
Sturgess Architecture of Calgary, RJC Consulting Engineers and PCL Builders Inc. produced the design for the project, which involves the construction of a cantilevered steel frame composed of irregular shapes that match the natural setting.
The design follows the natural landscape of the mountainside, then extends 30 metres outward to provide the bridge with a transparent glass floor.
Parks Canada delayed the decision on the project proposal, in order to take additional time to review the environmental assessment, as well as comments from the public.
“A major challenge in Canada’s national parks is to manage development in order to protect the area for future generations, while offering visitors the opportunity to enjoy and understand the national parks,” said Peter Kent, Canada’s Environment Minister and Minister responsible for Parks Canada.
“During the public consultation process, we heard from many Canadians representing many perspectives.”
A draft environmental assessment was released for a three-week public review period on Nov. 23, 2011.
The review process included open houses and an extensive public and aboriginal engagement program, as well as close examination of potential environmental effects and the consideration of public input under the Canadian Environmental Assessment Act (CEAA).
As part of the CEAA process, Brewster commissioned a wildlife impact study that focused on collecting mountain goat and bighorn sheep data.
The study provides information about how and when mountain goats and bighorn sheep use trails and cliffs in and around the Sunwapta Canyon Viewpoint.
The public comment closed on December 16, 2011.
As a result, the project will be subject to mitigation measures and proceed to the next steps in the development review process, including lease negotiations and construction agreement.
The Glacier Discovery Walk will be constructed on a previously disturbed, existing right-of-way for the Icefields Parkway.
The Icefields Parkway opened in 1940 as a scenic road for the use and pleasure of national park visitors.
| MOST POPULAR STORIES |
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 425 projects with a total value of $5,472,383,138 that Reed Construction Data Building Reports reported on Tuesday.
$60,000,000 Kelowna BC CANCELLED/ DEFERRED
WASTEWATER TREATMENT PLANT UPGRADES
$45,000,000 Grande Prairie AB Tenders
$30,000,000 West Vancouver BC Tenders
| CURRENT STORIES |
- High School Construction
- Victoria bridge inches closer to construction
- Collapse injures worker at Commonwealth Stadium
- Panel appointed to oversee hearings into B.C. mine project
- Bockstael celebrates 100 years
- More work needed to protect flaggers
- Co-founder of ATCO announces his intention to step down as chair
- SNC-Lavalin hit with $1.5 billion class action lawsuit
- PST returns to British Columbia
- Where does labour law stand on ladder safety?
- Construction continues on the MaRS Centre Phase II in Toronto
- Bending Lake Iron Ore pushes ahead with mining plans
- Reserve Properties continues plans for 109OZ condos in Toronto
- Ontario courts rule against owners rejecting low bids using undisclosed criteria
- Westray disaster 20th anniversary a call to safety action
- Dirt moves as Saskatchewan announces highway work
- Worker hurt in dressing room ceiling collapse at Edmonton stadium
- IBI Group raises $40.5 million from stock issue
- Plazacorp to spend $12.2 million on retail property development in 2012
- Ottawa to proceed with preliminary Lansdowne Park construction work, short-lists PCL, EllisDon and Pomerleau
- VIDEO: Highlights from the May 17 Daily Commercial News
- VIDEO: Common ladder safety errors in construction
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Economic Nuggets - May 15, 2012 (May 14, 2012)
- Canada Rode a Second Consecutive Month of Strong Job Gains in April (May 11, 2012)
- U.S. Employment Rose by a Mediocre 115,000 in April (May 4, 2012)
- More









