LATEST NEWS
Roadbuilding | Engineering | Concrete | Trade Contracting | Water & Wastewater
October 8, 2012
Plan to replace George Massey Tunnel meets with approval
Port Metro Vancouver supports the plan to replace the congested George Massey Tunnel under the Fraser River.
B.C. premier Christy Clark announced the provincial government’s intention to replace the tunnel at the 2012 Union of British Columbia Municipalities convention.
“The B.C. Government’s new commitment to replace the GMT (George Massey Tunnel) sends a strong message that this port and this province are open for business and ready to seize opportunities resulting from continued growth in Asian economies,” said Robin Silvester, president and chief executive officer, Port Metro Vancouver.
“A modernized crossing will further expand trade opportunities for the Fraser River terminals, like Fraser Surrey Docks, well into the future, which in turn supports a strong economy and good local jobs for many years to come.”
The premier told delegates at the convention that the government was investing more than $200 million in capital projects across the province, which includes starting the process to replace the tunnel.
It could take 10 years or more before a crossing is completed and there was no word if the crossing would be another tunnel or a bridge.
Port Metro Vancouver has been asking the B.C. Government to address the long standing concern that the tunnel presents a barrier to continued growth in the Fraser River terminals, in particular to Fraser Surrey Docks.
The single biggest challenge that the tunnel represents to ocean-going vessels is related to ship ‘draft’, the depth of water required for those vessels to transit the river.
In addition to supporting continued growth in the Vancouver Gateway, the tunnel is part of a primary north/south corridor with the busy nearby international border crossing that links the U.S. and Metro Vancouver.
When work began on the Deas Island Tunnel in 1956, it was the first tunnel in North America to be constructed using immersed tube tunnel technology.
The 629 metre (2,063 ft) long tunnel is made up of separate elements, each prefabricated in a manageable length in a dry dock.
The tunnel is a single tube subdivided with a concrete wall, with each side containing two traffic lanes.
About 1,500 people worked on the $29 million tunnel project. Nearly 500 men worked on the construction and placement of the immersed tube elements.
The Deas Island Tunnel was opened to traffic on May 23, 1959 and was later renamed the George Massey Tunnel.
| MOST POPULAR STORIES |
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 316 projects with a total value of $2,787,806,637 that Reed Construction Data Building Reports reported on Friday.
$1,000,000,000 Edmonton AB Prebid
$220,000,000 Medicine Hat AB Negotiated
AGRICULTURAL EXHIBITION EXPANSION
$50,000,000 Calgary AB Prebid
| CURRENT STORIES |
- Construction Site Arson
- Industry reacts to surprise B.C. Liberal majority
- Journal of Commerce Update for the week of May 20th, 2013
- Calgary Airport Tunnel
- Worker at centre of union sign up allegations speaks out
- Calgary program aims to get more people into the trades
- Midrise in the City
- Veterans battle barriers into the trades
- Government makes changes to online tendering
- SNC-Lavalin maintains that new bribery allegations have been resolved
- B.C. faces a tough battle for top talent
- Keyano College building state of the art training facility
- Essential skills can play a vital role in an apprentices' success
- Taking a closer look at the risks in green building for contractors
- Colleges conduct construction research in addition to teaching
- Skills Canada BC Competition
- Lower Mainland high school trades program is unique
- Construction Learning Forum aims to educate
- High schools looking for more industry participation
- Industrial construction supervisor program takes off
- Saskatchewan bill passed
- Edmonton garners support for regional cash for arena
- Feds pledge $5 million for Vimy memorial
- VIDEO: Competing in the trades
- Provinces need to loosen up apprenticeship rules
- Way Up on Westwood
- Building Up On Bayview
- Barrie Construction Association rolls with motorcycle ride for cancer
- Vimy Ridge memorial gets new visitor centre
- Minnesota Vikings unveil new multi-use stadium plan
- Proposed Ambassador Bridge twinning draws Windsor mayor’s ire
- Construction on pedestrian tunnel to Billy Bishop Airport continues to make progress
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- An Overview of Prices and Sales in the Diverging U.S. and Canadian Housing Markets (April 25, 2013)
- Canada’s Precarious Dependence on the Commodity Price Super-Cycle (April 22, 2013)
- Twenty major upcoming residential and transportation terminal construction projects - April 2013 (April 15, 2013)
- More









