LATEST NEWS
January 30, 2013
Flying saucer condo project takes off
5468796 ARCHITECTURE
The two-storey, circular 62M condominium project located close to the Exchange District in Winnipeg will be lifted up on 35-foot stilts. The 40-unit, $4.5 million project is scheduled for completion in spring 2014.
Construction is scheduled to get under way in Winnipeg in March on a two-storey circular condominium project dubbed the "Flying Saucer."
Designed by Winnipeg-based studio 5468796 Architecture Inc., the estimated $4.5 million development, called 62M, will be lifted up on 35-foot stilts.
Its circular design is spatially efficient and will provide each unit with a view.
As a whole, the 360° plan provides the widest possible perimeter for glass with the smallest amount of exterior envelope to construct, the architectural firm said.
In addition, all 40 units will have identical, pie-shaped layouts that simplify assembly.
Each 610-square-foot suite will be arranged so that the entry and utility spaces will occupy the narrow end, closest to the circulation core. This configuration frees the remaining square footage for a flexible, open living area that culminates in an expansive wall of floor to ceiling glass.
“We came up with the circular design and pie-shaped units to create a very efficient building and floor plan,” said 5468796 Architecture partner Johanna Hurme.
“Then we raised the building in the air to give every occupant a fantastic view.”
Named after its address, 62M will occupy the corner of MacDonald Avenue and Waterfront Drive, close to the Exchange District.
At ground level, 20 supporting columns spaced between alternating pairs of parking stalls will form a ring just inside the building’s perimeter.
The columns’ thinness will be a counterpoint to the band of housing, emphasizing the weight and mass of the building floating above.
“Once the columns and steel-frame platform are in place, we expect that construction of the wood-frame units will be quite streamlined and efficient,” said Ken Borton of 5468796 Architecture.
“Since every suite is identical, it’s possible to prefabricate all of the wall and floor framing off site, reducing the amount of work that needs to occur up in the air.”
The landscape design is conceived as a sea of greenery surrounding the building, leaving an open, cloister-like volume beneath the soffit. The garden is comprised of 62 Jack Pines set within a bed of mixed pinecones.
Rows of ferns will be planted between the pines and a series of pinecone-shaped planting beds will be found amidst the trees and around the central elevator and lobby core.
The project is being undertaken for Green Seed Development Corp. by a team that includes Langreen Contractors with Holz Constructors and structural engineers Lavergne Draward & Associates Inc.
Landscape architects are Atelier Anonymous.
The 27,000-square-foot building is scheduled for completion in spring 2014.
| MOST POPULAR STORIES |
- Union threatens legal action over allegations of signing apprentices at BCIT
- New partnership to bid on Fort McMurray transmission project
- Industry reacts to surprise B.C. Liberal majority
- VIDEO: Transit-oriented development in Edmonton
- Labour federation takes issue with some political donations in Alberta
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 316 projects with a total value of $2,787,806,637 that Reed Construction Data Building Reports reported on Friday.
$1,000,000,000 Edmonton AB Prebid
$220,000,000 Medicine Hat AB Negotiated
AGRICULTURAL EXHIBITION EXPANSION
$50,000,000 Calgary AB Prebid
| CURRENT STORIES |
- Construction Site Arson
- Industry reacts to surprise B.C. Liberal majority
- Journal of Commerce Update for the week of May 20th, 2013
- Calgary Airport Tunnel
- Worker at centre of union sign up allegations speaks out
- Calgary program aims to get more people into the trades
- Midrise in the City
- Veterans battle barriers into the trades
- Government makes changes to online tendering
- SNC-Lavalin maintains that new bribery allegations have been resolved
- B.C. faces a tough battle for top talent
- Keyano College building state of the art training facility
- Essential skills can play a vital role in an apprentices' success
- Taking a closer look at the risks in green building for contractors
- Colleges conduct construction research in addition to teaching
- Skills Canada BC Competition
- Lower Mainland high school trades program is unique
- Construction Learning Forum aims to educate
- High schools looking for more industry participation
- Industrial construction supervisor program takes off
- Saskatchewan bill passed
- Edmonton garners support for regional cash for arena
- Feds pledge $5 million for Vimy memorial
- VIDEO: Competing in the trades
- Provinces need to loosen up apprenticeship rules
- Way Up on Westwood
- Building Up On Bayview
- Barrie Construction Association rolls with motorcycle ride for cancer
- Vimy Ridge memorial gets new visitor centre
- Minnesota Vikings unveil new multi-use stadium plan
- Proposed Ambassador Bridge twinning draws Windsor mayor’s ire
- Construction on pedestrian tunnel to Billy Bishop Airport continues to make progress
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- An Overview of Prices and Sales in the Diverging U.S. and Canadian Housing Markets (April 25, 2013)
- Canada’s Precarious Dependence on the Commodity Price Super-Cycle (April 22, 2013)
- Twenty major upcoming residential and transportation terminal construction projects - April 2013 (April 15, 2013)
- More









