LATEST NEWS
February 18, 2013
Stalled pipeline projects impacting Canadian economy

The inability to get western Canadian crude to the right markets is costing the country’s economy dearly, according to a new report paid for by the Saskatchewan government.
Each stalled pipeline project means a loss to the Canadian economy of between $30 million and $70 million every day, said the report penned by the Canada West Foundation, a Calgary-based think-tank.
“The economic impact is just devastating,” foundation CEO Dylan Jones said in an interview.
The Saskatchewan government paid $50,000 to commission the report.
Premier Brad Wall has been an outspoken supporter of new pipeline projects, most recently signing a letter, along with 10 ..dU.S. governors, urging U.S. President Barack Obama to approve the Keystone XL pipeline. Alberta’s oilsands, the third-largest reserves on the planet, get most of the attention when it comes to the pipeline debate.
But Saskatchewan, which has considerable oil resources of its own, is affected by the pipeline pinch as well, Wall said in Regina.
“We hope that this helps get the message out, even to a greater degree than it is now, that we have a pipeline capacity issue in western North America and that’s costing Saskatchewan people a lot of money,” he said.
“Because of the pipeline capacity issue, we’re losing up to 19 to 20 per cent return on the taxpayer’s resource.”
In recent months, oilsands crude has been trading at a painfully steep discount to both U.S. and global light crude benchmarks. It’s a trend that has both eroded oilpatch profits and caused the Alberta government to warn of a $6 billion revenue shortfall this year.
At the heart of the problem is a lack of adequate pipeline capacity to get that crude to the markets that want it most.
Proposals of eastbound, westbound and southbound pipelines are in varying stages of development, but environmental opposition and political wrangling makes their fates uncertain.
Most pipeline capacity out of Western Canada heads to the U.S. Midwest, which Jones calls “the worst place in the world to be selling oil” as booming production from areas like North Dakota floods the market.
The Canada West Foundation says new pipelines need to be built in the right directions.
A massive expansion to Trans Mountain and Enbridge’s Northern Gateway proposal would enable crude to be transported to Asia via tankers from the West Coast, but they face stiff opposition within B.C. on environmental grounds.
TransCanada Corp. is awaiting final U.S. government approval for the northern leg of its Keystone XL pipeline, which would allow Canadian crude to flow to refineries on the Gulf Coast that are thirsty for heavy oil. Construction on the southern leg between Oklahoma and the Gulf is underway.
Refineries in eastern Canada and the U.S. Eastern Seaboard rely on pricey imported crude from overseas, which is hurting their economies.
Both TransCanada and Enbridge have projects in the works to send western crude eastward through reconfigured pipes that are already in the ground. It’s possible those lines could extend all the way to New Brunswick, home to Canada’s largest refinery.
“If pipeline project proposals such as Trans Mountain, Keystone XL and Northern Gateway don’t move forward, Canada will be foregoing $1.3 trillion in economic output, 7.4 million person-years of employment and $281 billion in tax revenue between now and 2035,” said Michael Holden, the foundation’s senior economist and author of the report.
While most of the benefits would accrue to Alberta, Holden said those three projects would add a combined $84 billion to economies elsewhere in Canada.
The report calls on provinces to work together to tackle the problem, the way Alberta Premier Alison Redford and New Brunswick Premier David Alward did recently in touting an eastbound oil pipeline.
Keith Stewart, climate and energy campaign co-ordinator at Greenpeace, says the Canada West Foundation report misses the point.
“If we want to avoid climate chaos, we have to stop building fossil fuel infrastructure like new tar sands pipelines,” he said.
“Canada can, and should be a winner by building the climate-safe, green energy economy that our kids need and deserve.”
The Alberta Federation of Labour also has a different view of the issue.
The group said in a report earlier this week that Alberta should require energy companies to upgrade oil in the province before they are allowed to ship it.
Federation president Gil McGowan said the Alberta government continues to approve in situ oilsands projects without requiring associated upgrading, which converts bitumen from the oilsands into light oil refineries can use.
It is flooding the U.S. market and driving down the price.
Environmental opposition has been particularly strong to pipelines that would ship oilsands bitumen, the thick, tarry stuff that needs to be diluted in order to flow.
And that alone might force governments to take a hard look at upgrading and refining opportunities at home, said Wall.
“There’s all manner of politics, some of it based on reality, some of it not,” said Wall.
“If we can’t get pipelines built because of it, we just have to start not moving bitumen, but moving a refined product.”
News from © Canadian Press Enterprises Inc., 2013
| MOST POPULAR STORIES |
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 316 projects with a total value of $2,787,806,637 that Reed Construction Data Building Reports reported on Friday.
$1,000,000,000 Edmonton AB Prebid
$220,000,000 Medicine Hat AB Negotiated
AGRICULTURAL EXHIBITION EXPANSION
$50,000,000 Calgary AB Prebid
| CURRENT STORIES |
- Construction Site Arson
- Industry reacts to surprise B.C. Liberal majority
- Journal of Commerce Update for the week of May 20th, 2013
- Calgary Airport Tunnel
- Worker at centre of union sign up allegations speaks out
- Calgary program aims to get more people into the trades
- Midrise in the City
- Veterans battle barriers into the trades
- Government makes changes to online tendering
- SNC-Lavalin maintains that new bribery allegations have been resolved
- B.C. faces a tough battle for top talent
- Keyano College building state of the art training facility
- Essential skills can play a vital role in an apprentices' success
- Taking a closer look at the risks in green building for contractors
- Colleges conduct construction research in addition to teaching
- Skills Canada BC Competition
- Lower Mainland high school trades program is unique
- Construction Learning Forum aims to educate
- High schools looking for more industry participation
- Industrial construction supervisor program takes off
- Saskatchewan bill passed
- Edmonton garners support for regional cash for arena
- Feds pledge $5 million for Vimy memorial
- VIDEO: Competing in the trades
- Provinces need to loosen up apprenticeship rules
- Way Up on Westwood
- Building Up On Bayview
- Barrie Construction Association rolls with motorcycle ride for cancer
- Vimy Ridge memorial gets new visitor centre
- Minnesota Vikings unveil new multi-use stadium plan
- Proposed Ambassador Bridge twinning draws Windsor mayor’s ire
- Construction on pedestrian tunnel to Billy Bishop Airport continues to make progress
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- An Overview of Prices and Sales in the Diverging U.S. and Canadian Housing Markets (April 25, 2013)
- Canada’s Precarious Dependence on the Commodity Price Super-Cycle (April 22, 2013)
- Twenty major upcoming residential and transportation terminal construction projects - April 2013 (April 15, 2013)
- More









