JOC ARCHIVES

January 8, 2014

Relative Construction

JEAN SORENSEN

The first two phases of MC2 include 32 and 25-storey towers in south Vancouver, B.C.

Intracorp Projects Ltd. is the general contractor for the mixed-used development.

James KM Cheng Architect Inc. did the design. The towers will be built over podium bases of five and seven storeys.

There will be commercial retail space at grade and residential units above. Consultants include Nemetz (S/A) & Associates Ltd. (electrical), Integral Group (mechanical), Glotman Simpson Consulting Engineers (structural), Bunt & Associates Engineering Ltd. (traffic) and LMDG Building Code Consultants Ltd.

Print | Comment

MOST POPULAR STORIES
TODAY’S TOP CONSTRUCTION PROJECTS

These projects have been selected from 479 projects with a total value of $1,224,678,004 that Reed Construction Data Building Reports reported on Wednesday.

OFFICES

$80,000,000 Calgary AB CANCELLED/ DEFERRED

OFFICE TOWER

$33,500,000 Port Moody BC Prebid

OFFICE BUILDING

$30,000,000 Calgary AB CANCELLED/ DEFERRED

Daily Top 10

TODAY’S TOP JOBS

Site Super
Ontario-East York

Project Control Coordinator - NLLP Program Office (16633)
Ontario-North Bay

Experienced Site Superintendent
Ontario-Cobourg

Project Manager
Ontario-Oshawa

Estimator
Ontario-Toronto

Site/Field Coordinator
Ontario-Mississauga

Superintendent
Alberta-Red Deer

Operations Foreman
British Columbia-Vancouver

Earthworks Estimator
Ontario-King

Junior Construction Manager
Alberta-Fort McMurray

More jobs 

myJobsite.ca

Your gateway to
the top careers
in construction
and design