| Note: | Preparatory study is expected to be completed by September, 2013; preliminary plans completion and documents for pre-qualified tender is anticipated in February, 2014; detailed design completion and invited tender is scheduled for June, 2014; award and construction start is planned for September, 2014. The construction will last two years: from September, 2014, to September, 2016. |
| Project: | cast-in-place concrete structural frame, structural steel frame, electric heating system, modernization of the drinking water production plant. The scope of the project includes upgrades and repairs to the drinking water production facilities to increase the plant production capacity. |
| Scope: | 2 storeys |
| Development: | Engineering |
| Category: | Sewage & Water plants |