| Note: | Renewable Energy Approvals (REA) are ongoing. REA documents may be submitted for final Ministry of Environmental (MOE) approvals late April/May 2013. MOE Approvals may be in place late summer 2013. Preliminary designs are ongoing. Schedules to begin detailed engineering designs are undetermined. Pending approvals, construction may begin fall 2013. Website is www.nrwc.ca. |
| Project: | construction of a Class Four (4) Wind Facility. This facility will have a total maximum name plate capacity of 3.0MW. The Preliminary Study Area is within Haldimand County and Niagara Region (including the Township of Pelham, Township of Wainfleet and the Township of Lincoln. The Preliminary Interconnector Study Area is within the Town of Grimsby, Town of Lincoln and the Township of West Lincoln, in Niagara Region, southern Ontario. |
| Scope: | 77 structures |
| Development: | Engineering |
| Category: | Elect power, building; Elect power, engineering |
| Owner | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|
| Gen cont | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|
| Other bldg designer | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|
| Consultant | Complete information is available to subscribers. Click HERE to find out how to subscribe.
|